At IOV Structura, we believe that a structural engineer’s mission does not end with the delivery of the blueprints. Technical assistance represents the critical bridge between theoretical vision and practical execution, guaranteeing that every reinforcement detail, every structural joint, and every concrete grade strictly adheres to the engineered safety standards.
Execution errors are the leading cause of premature building degradation. Through our technical assistance service, we provide continuous monitoring during key milestones, ensuring that technical solutions are implemented correctly, efficiently, and without deviations that could compromise structural integrity.
Key Milestone Control: We actively participate in the inspection of concealed works (reinforcement of foundations, columns, beams, and slabs) before concrete pouring. We verify compliance regarding bar diameters, spacing, and lap lengths, signing the necessary inspection reports (PVFD) to allow work to proceed.
Prompt Resolution of Non-Conformities: The construction site is a dynamic environment where unforeseen situations can arise. We provide real-time technical adaptation solutions for any discrepancies between the design and the field, avoiding costly bottlenecks and schedule delays.
Material Quality Verification: We monitor certificates of conformity and laboratory test results for all materials used (concrete, rebar, precast elements). We ensure that exactly what was specified in the technical memorandum arrives on-site.
Coordination with the Contractor and Site Supervisor: We facilitate technical communication between all stakeholders. We interpret complex execution details for the construction team and provide consultancy to the site supervisor (Diriginte de Șantier) to ensure a final acceptance without objections.
Participation in the land handover and rigorous verification of the construction axes layout according to the Building Permit (D.T.A.C.).
Key milestone: confirming the soil nature and the foundation depth to ensure correlation with the geotechnical study and structural calculations.
Inspection of reinforcement cages (diameters, shaping, positioning) for foundations, columns, and beams before concreting. Issuing the pouring approval.
Monitoring the execution of the superstructure and participating in the key milestones established by the control program approved by the State Inspectorate for Construction (I.S.C.).
Drafting the designer's final report and participating in the handover committee upon work completion, certifying the compliance of the execution with the technical project.